Have questions? Click here
Test page with made-up data. Northwind Engineering doesn’t exist.

Preliminary plan

Northwind Engineering

Prepared by Ignacy Lozinski after our session on 1 January 2027

This plan is based on your two forms and our conversation. I haven’t seen your hub, so treat it as a first diagnosis, not a final verdict.

Your situation today

Where are you today?

I went through your two forms. This is what I see in your office today.

1

works

3

partly there

3

missing

1

not known yet

✓

What already works

A good base. We build on it.

✓ Works

01

Folder structure on big projects

Your bigger projects all use the same folders. That’s a good base.

You wrote“The folder structure works on our bigger projects.”

!

What you have, but it doesn’t work all the way

You have these things, but they’re not used the same way everywhere.

! Partly there

02

Approving drawings

There’s an approval step in the platform, but most approvals still happen in email.

You wrote“Most approvals still happen in email.”

On the route: month 2

! Partly there

03

Naming

You have a naming standard, but nobody checks it.

You wrote“Nobody checks it.”

On the route: month 3

! Partly there

04

Access for new people

New people get access, but everyone gets access to everything.

You wrote“We give access to everything.”

On the route: after 90 days

✕

What’s missing

These don’t exist yet. Most of your problems start here.

✕ Missing

05

One entry point for consultant models

Models from consultants come by email and land wherever there’s space.

You wrote“They send models by WeTransfer.”

On the route: month 1

✕ Missing

06

A record of who approved what

Nobody can show later who approved a drawing.

You wrote“We can’t find who said yes.”

On the route: month 2

✕ Missing

07

A starting template for new projects

Every new project starts from an empty hub.

You wrote“Every project starts from zero.”

On the route: after 90 days

?

What I don’t know yet

We’ll talk about this in the session.

? Not known yet

08

Who passes on changes

Your forms didn’t say how changes reach the team.

You wrote“It depends.”

Your main bottleneck

What holds everything else back?

Most of the problems above have one cause.

The bottleneck

Nothing enters the platform through one door

Models, approvals and decisions arrive by email. The platform only sees part of the work.

Today

  • Consultant models come by email.
  • Approvals happen in email.
  • Nobody can show who approved what.

After the route

  • Every model comes in through one door.
  • Approvals happen in the platform.
  • Every approval stays with the file.
Email → one door

If nothing changes

The platform keeps showing only part of the work.

Where I’d start

One entry point for consultant models, on one live project.

The route

How do you get there?

Step by step. The order matters more than the speed, because each step builds on the one before.

Today · you are here

This preliminary plan

You’ve seen where you are and what holds the rest back.

A

Before the start

A full audit of your hub

What happensWe look at what really exists in your hub.

You’ll haveThe pace of the route and what we’ll measure.

1

Month 1

Fixes05

One door for consultant models

Gets decidedWhere consultants upload, and who checks the upload.

You’ll haveOne live project where every model comes in one way.

2

Month 2

Fixes0206

Approval inside the platform

Gets decidedWho approves what.

You’ll haveApprovals that stay with the file.

3

Month 3

Fixes03

Names checked at upload

Gets decidedWhich names the platform accepts.

You’ll haveWrong names stopped at the door.

→

After 90 days

Fixes0407

Access rules and a starting template

Access by role and a template every new project starts from.

This is a proposed pace. We confirm it after the audit, based on the time your team really has.

Your goal

Where do you want to be?

This is how you described a good year from now, and what of it is realistic in 90 days.

A normal week where nobody asks which model is the latest.

Your words, from the form

Realistic in 90 days

  • One door for consultant modelsMonth 1
  • Approvals in the platformMonth 2

In 90 days, if your team has the time

  • Names checked at uploadMonth 3

Within a year

  • Access by roleAfter 90 days
  • A template for every new projectAfter 90 days
Next step

What happens now?

This plan shows the direction. The details come next.

Not in this plan yet

  • The detailed steps for each decision
  • How fast your team can go, given the time people really have
  • What we’ll measure at the start and at the end

These come from a full audit of your hub, which is the first phase of the programme.

Next step

A 30 minute call with you and your director on 10 January.

Questions about the plan? Just reply to my email.

Prepared for Northwind Engineering by Ignacy Lozinski. Confidential.

logo

Enter your email below. You’ll get early access to the CDE ROI Accelerator offer when it’s ready, plus practical CDE implementation tips every other Tuesday.

    By joining this mailing, you agree to receive information about news, educational materials, and services from cderoiaccelerator.com

    Still have questions?

    Ask about the program